DN 1000PN 16SDR 17HDPE 100
EST. 2003 · HDPE PIPELINE SPECIALISTS · GAUTENG / FREE STATE / KZN

Pipeline infrastructure that doesn't fail.

South Africa's specialist contractor for HDPE gas, water, and sewerage pipelines. 22 years building infrastructure the country runs on — from BRT corridors to Steyn City to Egoli Gas networks.

Trusted by Egoli Gas · Steyn City · BRT Network · Gautrain ·

Scroll

Infrastructure Partners

Egoli Gas
BRT Network
Steyn City Properties
Gautrain
City of Johannesburg

Our Capabilities

Full-spectrum pipeline and civil works.

DN

HDPE Pipelines

25mm — 1000mm · SDR 11 / 17 / 26

Specialist HDPE butt welding for water, gas, and sewerage. Every weld certified with data logging. Latest bead-cutting technology with CCTV verification.

Gas Networks

Natural Gas · LPG · Commercial · Industrial

Full natural gas and LPG network installation. From property-scale gas reticulation to industrial-grade transmission pipelines. 50+ completed projects for Egoli Gas.

Water & Sewerage

Potable · Waste · Stormwater

Domestic, industrial, and transmission lines for water and sewerage. HDPE or steel construction. Complete civil integration including manholes, pump stations, and connections.

Steel Pipelines

High-Pressure · Corrosion-Coated

Steel pipeline construction for high-pressure gas and water transmission. Full welding capability with NDT-verified joints. Suitable for industrial and municipal applications.

Roads & Paving

Asphalt · Concrete · Block Paving

Complete road and paving services. Integrated with our pipeline work for full site reinstatement, or standalone civil works for new developments and industrial yards.

Retaining & Structures

Gabions · Loffelstein · Concrete

Retaining walls, gabion structures, and reinforced concrete work. Storm water management infrastructure. Engineered solutions for difficult sites and slope stabilization.

Technical Differentiation

The only HDPE contractor in SA with certificate-grade weld traceability.

Most contractors weld pipe and hope it holds. We use data-logging fusion machines that record temperature, pressure, and cooling time for every joint. Every weld gets a certificate. Every certificate has a serial number. Every project gets a complete weld register.

  • Data-logged butt welds with certificate per joint
  • CCTV bead cutting verification
  • Full weld register supplied per project
  • 25mm to 1000mm pipe diameter capability
Ø 1000mmHEATERHDPE 100HDPE 100WELD ZONEDATA PORTREC ●DN 1000

Butt Fusion Welding · DN 1000 · Certified Process

0+
Years Building

Operating since 2003 across South Africa's most demanding infrastructure projects.

0+
Egoli Gas Projects

Completed for South Africa's largest natural gas distributor — and currently on their biggest project yet.

0%
Of BRT Pipeline Work

Relocated gas, water, and sewerage lines for Johannesburg's Bus Rapid Transit corridors.

0mm
Max Pipe Diameter

Full HDPE butt fusion capability from 25mm domestic to 1000mm transmission-grade pipeline.

Recent Work

Built on the ground, across three provinces.

From the Egoli Gas network to the BRT corridor, Steyn City to Egoli's biggest pipeline project to date. A few of our recent builds.

NETWORK PLAN VIEW

Egoli Gas · Main Network Expansion

DN 800 · 12KM · 2024
BRT CORRIDOR · SECTION— RELOCATED PIPELINE —

BRT Corridor · Pipeline Relocation

Multiple Stations · 2008-2014
ESTATE RETICULATION

Steyn City · LPG & Water Network

2000+ Homes · Complete Network

Why Velocity

We don't subcontract. We don't compromise. We don't miss.

01

Own Equipment, Own Crews

We don't subcontract critical pipeline work. Every HDPE weld, every excavation, every reinstatement is done by Velocity-employed crews on Velocity-owned equipment. Quality control starts and ends with us.

02

Invested In The Tech

Data-logging fusion machines, CCTV bead cutters, NDT testing equipment — we run the latest HDPE welding technology in the country. Because pipeline failures are expensive. Certified welds aren't.

03

22 Years Of No-Fail Record

Since 2003, we've delivered for Egoli Gas, Steyn City, the BRT network, and dozens more. The infrastructure we built two decades ago is still in the ground, still moving gas and water. That's the standard.

Start A Project

Need pipeline work done right?

Send us the project details and our team will respond within 24 hours with a scope, timeline, and quote. Most projects start within 6 weeks of brief.

+27 11 XXX XXXX info@velocityconstruction.co.za
Johannesburg, Gauteng · Serving Gauteng / Free State / KZN

Project Enquiry

Response within 24 hours. We review every enquiry personally.